QBBBJ-2000 Edge trimming overlock sewing machine for packing quilts blankets
Â
Function parameters:
1.The maximum sewing speed: 2000 needle/min
2.Maximum length of the track line:0-6mm
3.The needle bar trip:36mm
4.Away from the needle:2-6mm
5.Soe rotation: horizontal large-scale rotating spindle
6.Needle machine:GR-2-2 or DP5×17 125-80
7.Fuel: Automatic, Manual local fuel
8.Full-power machine:750W
1, Â Engineers available for overseas service according to request.
2, Â Any machine from our factory has one year guarantee from BL issued date.
3, Â 24-hour technical support via email,telephone,skype,whatsapp,TM etc.
4, Â manual book in English version with details.Â
1,How to contact you?
You could contact us via TM,wechat, QQ, email or call us directly.Â
2,Are you factory or trading company?
We are factory with foreign trading property. That is to say,we produce machines and we export to customers by ourself.Â
3,How many countries have your products been exported to?
Until now our machines have been already exported to more than 100 countries.Welcome to visit us.
4,Which payment term is accepted?
30% in advanced payment by T.T and 70% paid before shipment by T.T.
Welcome for your inspection for the machines before shipment.
5,Can you make speicial voltage of the machines?
yes,usually the machines are made with 380v,50hz,3 phases or 220v,50hz,single phases.If you need special, please inform us and we customize.
Small Cement Silo
1.The cement silo must be erected by a special crane when working. Then place it on the prefabricated concrete and check the verticality between cement silo and the horizontal level. Then weld the bottom of the silo with embedded parts firmly.
2.After the silo is fixed, bulk cement truck transports the cement to site. Then conveying the cement in truck to cement silo by the air pressure of the truck.
3.In the process of conveying cement to storage bin, the operator should press the button of dust collector uninterruptedly to shake off the cement attached to the duster bag to prevent blocking and silo explosion.
4.Once the bag is blocked and the pressure in the silo exceeds the safety pressure value , then open the safety pressure valve to release the inner pressure, to avoid the explosion accident.
Cement silo working principle:
1.Bulk cement truck transports the cement to the site.
2. Conveying the cement in truck to cement silo by the air pressure of the truck.
3. Conveying the cement in cement silo to the Concrete Mixer by the Screw Conveyor.
Small Cement Silo,Silos Batching Plant,Silo For Concrete Batching Plant,Silos Concrete Mixer