Mine control impact rock pressure requirements

Mine control impact rock pressure requirements

[Procedures] Article 228 The mine prevention and control of ground pressure (hereinafter referred to as anti-shock) shall comply with the following provisions:

(1) Establish specialized institutions and personnel.

(2) Adhere to the principle of "zone first, partial follow-up".

(3) The medium and long-term anti-shock plan and the annual anti-shock plan must be prepared, and the special measures for anti-shock must be included in the work procedures for the mining face.

(D) In coal mining rock burst layer, it must take the risk of impact prediction, monitoring and early warning, prevention treatment, comprehensive prevention and control measures to effect inspection, security and so on.

(5) A training system for anti-shock must be established.

[Implementation] (1) The impact pressure mine should set up a special anti-shock pressure (hereinafter referred to as anti-shock) mechanism, which is responsible for the prevention and control of the impact pressure, and is equipped with full-time anti-shock technicians and full-time construction teams. The impact pressure mine should improve various anti-shock management systems, clarify the responsibility system for managers at all levels, and carry out anti-shock work.

(2) Regional advance refers to avoiding or reducing the stress concentration in the mining area from the aspects of mining layout and mining design, and preventing the occurrence of impact ground pressure. Before the mining operation, the risk assessment of the mining area, the division of the dangerous area, the design of the anti-shock, the development of the impact risk monitoring and treatment plan, and the regional monitoring and early warning shall be carried out. Partial follow-up is to optimize the adjustment of the ground pressure monitoring and prevention technology system according to the dynamic information such as monitoring information, impact pressure control effect and newly exposed geological conditions during the mining operation.

(3) The mid- and long-term anti-shock planning of the impact ground pressure mine shall conduct impact risk assessment on the mining area, divide the impact danger area, and clarify the technical measures for prevention and control of impact ground pressure. The annual anti-shock plan for the impact ground pressure mine shall determine the dangerous area of ​​impact ground pressure within the annual mining range and formulate special measures for prevention and control. Special measures for anti-shocking should include evaluation and regional division of impact risk in the operation area, geological structure description and concise chart, mining location (including upper and lower layers) and its impact range map, excavation and recovery methods and processes, roadway and coal mining Support of working face, blasting operation system, prevention and control measures of impact ground pressure, emergency measures and disaster avoidance routes when impacting earth pressure disasters occur.

(4) Prevention and control include regional prevention and management and partial relief measures. Regional prevention and control includes mining protective layers, optimizing production layout, rationally adjusting mining sequence, determining reasonable mining methods, reducing stress concentration, and adopting pressure relief measures in advance. Partial solutions for disaster relief include coal seam water injection, borehole pressure relief, blasting pressure relief, and hydraulic fracturing.

The effect test is an evaluation of the effectiveness of the anti-danger effect in the impact area. The effect test methods include ground stress, microseismic, electromagnetic radiation, and drill cutting method.

Safety protection refers to measures taken to avoid personal injury and equipment damage caused by impact pressure, including system improvement, personal protection, equipment fixing, and strengthening support.

Use 1

Truck Mounted Water Well Drilling Rig

Truck-mounted drilling rig for water well sale to Kenya,South Africa,Uganda,Nigeria,Tanzania,muddy and remote location water well portable drilling rig for sale.


Yikyui offers a range of exploration and geological drilling equipment and service.


Yikyui rigs are either hydraulic or mechanical and are designed and manufactured according to a large selection of configurations and different solutions,Truck Mounted Water Well Drilling Rig

In order to cover most of drilling sector needs, Yikyui offers varied solutions and products besides the complete rigs, including rotary drilling equipment and consumables, rotary and hammer drilling equipment, drill pipes, drill collars and casing, drilling accessories, as long as training and long-term technical assistance on site, for maintenance and exploitation of drilling rigs.


Reasonable overall layout uses the tractor-mounted or full ground chassis for transportation with good maneuverability.

Very flexible in difficult roads and can be widely used in many fields such as resource exploration of hydrology wells, coalbed methane, the shallow layer of shale gas, terrestrial heat, etc, and can also be used for coal-mine gas exploitation salvage work.

The top-mounted driving head principal shaft has a great drift diameter, suitable for many kinds of construction work such as slurry drilling, air drilling, and air foam drilling, meeting the demands for well-drilling at different terrain strata.

Truck-Mounted Drilling Rig,Hydraulic Water Well Driller,Field Irrigation Well Drilling Rig,Farm Irrigation Well Drilling Machine

Henan YK Prospecting Machinery Co., Ltd , https://www.yyboreholedrilling.com