Technical requirements for mining of open pit mines

( 1) The lowest recoverable elevation: generally not lower than the lowest ground level elevation near the mining area. If it is lower than the lowest ground level, it must be determined through technical and economic argumentation.
      ( 2 ) stripping ratio: the ratio of the total stripping of the overburden, vein rock, interlayer, and surrounding rock to the total amount of ore, generally not more than 0.5 : 1 ( M 3 / M 3 ).

(3) Mining Thickness: Limestone: large, medium-sized ore generally 8m, small mineral 4M; clayey material, a siliceous material: rock-like ore ships 4m, like soft ore ships 1 5m.

(4) The thickness of the stone is removed: the rocky ore is generally 2m, and the soft ore is generally 1m.

(5) Final slope angle of the stope: the rocky ore is generally 50 ° ~ 60 ° , and the soft ore is generally 45 ° .

(6) Final chassis stope minimum width: rocky ore: medium-sized generally not less than 60m, small ore generally not less than 40m; soft like mine: a medium-sized generally not less than 40m, a small-sized ore generally not less than 20m.

(7) blasting safety distance: The mining boundary deposits of blasting safety distance highways, railways, power lines, residential and other major buildings generally not less than 3 00 m, such as blasting safety distance of less than 3 00 m, and investors should Agreed.

Carbon Felt Carbonisation Furnace

Carbon Felt Carbonisation Furnace,Cvd Vapor Deposition Industrial Furnace,Multi-Station Vapor Deposition Furnace,Special Furnace For Carbonization Furnace

Zhuzhou Yuanhang Industrial Furnace Technology Co., Ltd. , https://www.zzyhgyl.com