mine | Section | Ore inclination (°) | Ore thickness (m) | Characteristics of roof stone | Ore stability | Buried depth (m) | Mining method | Mining method parameters (m) | Empty area support status | Empty area |
Shao Dong Gypsum mine | 7~20 | 13~19 | Limestone, medium stable Æ’ = 6 ~ 8 | Steady, Æ’=6~8 | 50-70 | Room method | Mine room width 10 ~ 20 Mine length 30 ~ 45 | The top pillar is 4m, the continuous column is 6~8m wide, and the proportion of the pillar is 40%~50%. | The roof is slightly curved and sinking, and the suburban surface is currently protected. | |
Pingyang Mine | Jilongshan | 20~30 | Average 3 to 7 | Tuff , stable, ƒ=8~10 | Gravel-like alum, stable, ƒ=12~15 | 30~40 | Empty field method | Going 100 to 150 long, Inclined from 100 to 120, Stage high 40 | Supporting the roof with irregular pillars with a spacing of 20~25m and a diameter of 5m | The empty area is 250,000 m 2 , and the surface is partially collapsed. The rest is in good condition. The surface farmer houses are protected. |
Taishan Xishan Gypsum mine | Plate kiln Concave mining area | 5~15 | Average 8 to 10 | Shale dolomite | More stable | 60~70 | Room method | The mine is 6-8 wide. Picking height 6 to 10, Panel length 100 | The top mine is 2~3m thick, and the single column size is 6×6~8×8m. | The empty area is 400,000 m 2 , and the empty area has a long time of more than 30 years. The roof is detached, the local part is naturally degraded, the pillar is cracked, and the surface is still good. |
Feldspar Gypsum mine | Jiajiapo | 5~10 | Average >10 | Shale class Dolomites | More stable | Average 65 | Room method | The mining area is 8 wide, the mining height is 8-10, and the length of the panel is 90-100. | The roofing mine is 3m thick and the column is 6×6~8×8m. | The empty area is 180,000 m 2 , and the existence time is 20 to 30 years. The local pillars are cracked, the roof partially falls off and the surface is still good. |
The new copper smelting ore | 520 ore body 420 ore body | 26~55 | Average 7 Average 2 | Crystalline limestone, ƒ=4~6 Dolomite, limestone, stable, ƒ=3~7 | Copper-bearing skarn, stable, ƒ=8~10 | House column method, room column retention method | The stage height is 50-67, the length of the nugget is 40-60, the width of the column is 6, the bottom column is 5, and the top column is 2.5. | Leave a permanent column for one stage, leaving a permanent column support empty area roof at about 200m at this level. | The total volume of the empty area is 1.52 million m3 , the maximum vertical height is 250m, and the strike length is 400m. It has been in good condition for nearly 20 years. | |
Dangping tungsten mine | Baoshan | 20~40 | Average 12 | Crystallized limestone, stable, Æ’=10 | 矽å¡å²©çŸ¿Æ’=20~21, sulfide ore Æ’=8~15 | Comprehensive law, room and pillar method, comprehensive or pillar-retaining method | Stage height 40 to 51 Nugget length 50 ~ 60 | In the 210,000 m 3 large empty area, there are two permanent pillars of 5 m and 10-12 m along the long axis, and the others are irregular pillars. | The total volume of the empty area is 420,000 m 3 , which is in good condition and partially collapsed near the surface. | |
Sinko mercury mine | Hotel | 15~25 | 3 to 9 parts Up to 18 | Sputum dolomite, Æ’ = 8 ~ 10, partial Æ’ = 10 ~ 14 | Steady, Æ’=8~10 | 240 | Comprehensive law | The nugget is 40~50 wide and slant length 32 | The top and bottom columns are 3 meters wide, leaving 3 meters of irregular ore pillars and artificial rock pillars to support the roof of the empty area. The proportion of pillar reserves is 8% to 12%. | The old airspace has been exposed for 100 years and is in good condition. |
Tongren mercury mine | Lu La | 5~10 | a few meters to More than 10 meters | Steady, ƒ=8~10 | Steady, ƒ=8~12 | 150 | Comprehensive law | Nugget area 30×40 | 15 to 20 meters spacing, ø4m pillar and artificial rock pillar support empty area roof | The empty area has been maintained for more than 20 years without collapse |
Guizhou mercury mine | Foot punch | Slow tilt | 0.3 to 4 to 5~10 | Mud dolomite, ƒ=10 | 100 | Comprehensive law, room method | Ø2~6m irregular pillar support empty area roof | The area of ​​the goaf is 50,000 m 2 and the volume is 340,000 m 3 . The maintenance of the empty area is good for more than 20 years. | ||
Guizhou mercury mine | Wanshan | 3~17 | 0.5 to 30 | Dolomite limestone, ƒ=8~10 | ƒ=10~12, a few ƒ=16 | 55~340 | Room method | Mine length 30, width 8-12 | Irregular pillar support aerial roof, the proportion of pillar reserves is 5% to 6% | The goaf is up to 30m, and some old empty areas are 500-600m 2 . The roof rarely lands naturally. |
Barry tin mine | 20~30 | 0.5 to 8 | Thick layered limestone, stable, ƒ=8~12 矽 shale, ƒ=12~15 | Steady and medium stability | 200 | Comprehensive law | The stage height is 20, the length of the nugget is 50-60, the width of the top column is 1.2-2, and the width of the bottom column is 3. | Ø2~3m permanent pillar support roof | 5 years after the mining of individual ore blocks, the roof of the empty area collapsed |