1,Currency:Â Â Â RMBÂ Â Â Â USDÂ Â Â Â Â JPYÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â | |||||||
2,Payment of Tooling: 50% prepayment,the rest should be paid in 10 days after the sample approval. | |||||||
3,Mold Development and Sample Delivery: After both sides confirm 2D and 3D drawings and  prepayment, the mold manufacturing cycle is normally 14 days,  samples manufacturing cycle is normally 14 work days. | |||||||
4,Tooling lifetime:200K times | |||||||
5,Free Sample Qty:30 pcs | |||||||
6,Production Cycle:Once the order is placed, we will ship products in several batches.( Freight is on us) | |||||||
7,Payment:Payment collected within 105 days after invoicing.  | |||||||
8,Minimum Order Quantity :10K pcs (The offer is invalid if the quantity is less than MOD.) | |||||||
9,Validity of Quotation: 60 Days | |||||||
10,1)Before the mold openning,both sides must comfirm 2D and 3D drawings         2) This offer is based on the existing drawing.If future products requirement contain material changes  in dimension,material, and productiong procedure, the quotation must be revalued. |
1,Currency:Â Â Â RMBÂ Â Â Â USDÂ Â Â Â Â JPYÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â | |||||||
2,Payment of Tooling: 50% prepayment,the rest should be paid in 10 days after the sample approval. | |||||||
3,Mold Development and Sample Delivery: After both sides confirm 2D and 3D drawings and  prepayment, the mold manufacturing cycle is normally 14 days,  samples manufacturing cycle is normally 14 work days. | |||||||
4,Tooling lifetime:200K times | |||||||
5,Free Sample Qty:30 pcs | |||||||
6,Production Cycle:Once the order is placed, we will ship products in several batches.( Freight is on us) | |||||||
7,Payment:Payment collected within 105 days after invoicing.  | |||||||
8,Minimum Order Quantity :10K pcs (The offer is invalid if the quantity is less than MOD.) | |||||||
9,Validity of Quotation: 60 Days | |||||||
10,1)Before the mold openning,both sides must comfirm 2D and 3D drawings         2) This offer is based on the existing drawing.If future products requirement contain material changes  in dimension,material, and productiong procedure, the quotation must be revalued. |
Steering System,Steering Pump,Fuel Pump,Common Power Steering Pump
Fuxin Dare Automotive Parts Co., Ltd. (DARE AUTO) , https://www.fuxindareauto.com